Production Engineering
Plant Engineering
History
Year
|
Activities
|
---|---|
1978
|
Central monitoring system for plant utility operations (at Kinuura Plant)
|
1979
|
Secretariat of the Committee for Energy-saving Measures
|
1980
|
Optical fiber cable introduced
|
1981
|
City gas introduced (at Kamigo Plant)
|
1982
|
Steam turbine generator (at Honsha Plant)
|
1984
|
Outdoor AGV (at Myochi Plant)
|
1985
|
High-speed digital network (linking Toyota, Tokyo and Nagoya facilities)
|
1986
|
Planning for North American plant construction*
|
1989
|
Startup ceremony for industrial waste power-generation plant
|
1990
|
"5R activities" for industrial waste reduction
|
1991
|
Gas turbine co-generation facility (at Takaoka Plant)
|
1993
|
Toyota Environmental Action Plan
|
1994
|
Reinforcement of chemical substance management
|
1995
|
Completion of office reform (commenced in 1989)
|
Operation start of automobile shredder residue (ASR) recycle proving plant (in May)
|
|
1996
|
ISO certification preparation for overseas business unit
|
1998
|
Operation start of ASR Material Recycle plant (August, Proving plant closed)
|
1999
|
International Trade and Industry Minister Prize (for distinguished recycle promotion)
|
2000
|
Electronic system for construction report sheet
|
Achieved zero emission of landfill waste
|
|
2001
|
Activities for digital engineering
|
"Eco Research" company established
|
|
2002
|
Thermal recycling proving plant for ASR
|
2003
|
IC Card reader system to manage a time of being in the office
|
2004
|
12 large-sized windmills at Tahara Plant (first one started operation in December)
|
2005
|
Participation in NEDO verification tests (using high-temperature gasification system)
|
Utility divisions merged among 12 plants in Japan
|
|
Gas engine co-generation facility (at Tsutsumi Plant)
|
|
2006
|
Solar battery power-generation facilities introduced (at Banpo Plant of Toyota Motor Thailand [TMT])
|
2007
|
Completely zero emissions of direct landfill waste
|
Sustainable plant concept announced
|
|
Production Engineering Forum held (with the environment as the main theme)
|
|
2008
|
Sustainable Plant Activities
|
Large (2,000-kilowatt) solar battery panels at Tsutsumi Plant
|
|
2009
|
Utility total expense-reduction activities for emergency profit improvement
|
Renewal of furnace at Motomachi Environment center (completed in April)
|
|
2010
|
Promoted investment structure improvement through thorough SE (e.g. "1/2 plant" efforts, etc.)
|
2011
|
Reconstruction aid for Great East Japan Earthquake
|
Summer rotation holiday scheme developed
|
- *
- After starting the construction of plants in North America in 1986, plants and offices were built around the world, starting with Europe and Asia.